Municipality of Topola

Šumadija and Western Serbia - Šumadijski District

Level of development - Group II

Active enterprises - 245

Active entrepreneurs - 979

19,146


Citizens
h-money

66,419


Average income

357


Area
Topola
Topola
Topola
Topola
svi-projekti

5

Total Number of Projects
from 2010

160,948 Euros

126,064 Euros

(Donors 78%)

34,884 Euros

(Co-funding 22%)

-

Programme funds: -

Co-funding: -

-

CREST - Cultural Revival for an Enriched Sumadija Tourism: Creating an Integrated and Innovative Regional Tourism Offer

Integrated project

Partner on the project: Regional economic development agency for Šumadija and Pomoravlje, Cultural Heritage Preservation Institute Kragujevac, Institute for the Protection of Cultural Monuments of Serbia, Tourism Organisation of Serbia (TOS)

Enhancement of regional tourism in Aranđelovac, Topola, Knić, and Rača through significant infrastructure upgrades and digital integrations at key historical sites. The project includes constructing the "Risovača Cave" Visitor-Educational Centre in Aranđelovac, reconstructing the King's Winery in Topola, renovating the House of Culture in Borač in Knić, and arranging Petrovi dvori in Viševac (Rača). By equipping these sites with advanced technology, the initiative aims to improve tourism infrastructure. Emphasis is placed on staff training and developing new tourism products to enrich the visitor experience. The project aims to attract more visitors and benefit the local economy, directly impacting 1,500 professionals and indirectly serving over 80,000 people, transforming the region into a distinguished tourism destination. Total project value: €1,356,364, EU funds: €1,038,045, Co-funding: €318,319.

Project value:

Programme funds:

Co-funding:

-

-

-

-
-

160,948 Euros

Programme funds: 126,064 Euros

Co-funding: 34,884 Euros

-
160,948 Euros

Regulation for economic growth - Working Zone 4 in Topola

DRP

The Detailed Regulation Plan will provide planning conditions to start infrastructural equipping of the Zone, including the design, construction and development of sewerage, the ring road and the network of streets, thus enabling access to each parcel and issuing construction permits. This will create conditions for attracting investors.

Project value:

Programme funds:

Co-funding:

12,370 Euros

11,133 Euros

1,237 Euros

Development of Execution Design for distributive Irrigation Network

Technical Documentation

The development of technical documentation for the phase II irrigation distribution system, which covers 300 ha, when constructed, will bring water to 80 producers in the villages of Vinča and Plaskovac. It should also create conditions for an increase in agricultural production and sales, since the irrigation system will ensure continuous quantity and quality of produce to small family owned fruit-growing enterprises from the municipality, which will be able to increase their market share at domestic and foreign markets and create new jobs.

Project value:

Programme funds:

Co-funding:

48,913 Euros

30,000 Euros

18,913 Euros

Provision of a back-up server for the e-permitting system

E-permitting

Improvement of the electronic system for the issuance of building permits through the provision of a back-up server, which will enhance its stability and availability for over 6,500 users that benefit from it every day. Server and network equipment were procured through the project, as well as necessary licences. The aim of this activity was to contribute to the creation of a more favourable business environment by improving the efficiency and transparency of the e-government and, ultimatively, to new investments. At the same time, citizens’ trust in institutions, as well as the quality of services that are being offered through the e-government will also be enhanced.

Project value:

Programme funds:

Co-funding:

2,141 Euros

2,141 Euros

-

Power of GIS for Sustainable Socio-economic Development of the Topola Municipality

Introduction and Development of GIS

GIS project will develop specialised spatial and urban planning applications to allow for evidenced based planning and decision making, improvement of public infrastructure, attraction of investments, tourism development, and more effective and efficient protection of social assistance users.

Project value:

Programme funds:

Co-funding:

97,524 Euros

82,790 Euros

14,734 Euros

-

-

Programme funds: -

Co-funding: -

-
-
-

-

Programme funds: -

Co-funding: -

-
-
-
-
-